Skip to main content

Building coefficient and planning zones in Cyprus

What building coefficient, coverage, floors and height mean in a Cyprus planning zone, a worked example, and where to confirm them for a plot.

Reviewed 8 November 2026 by Alexandros Papasavva, Founder and CEO, Emvadon

In short

  • The building coefficient (συντελεστής δόμησης) is the ratio of the covered floor area of all floors to the plot’s net area. Plans write it as a ratio, such as 0.60:1, often quoted as 60%.
  • Coverage (ποσοστό κάλυψης) limits how much of the net plot area buildings may cover. Each zone also sets a maximum number of floors and a maximum height in metres.
  • The figures come from the development plan in force for the area: a Local Plan, an Area Scheme or, outside them, the Policy Statement for the Countryside.
  • Many spaces are excluded or counted differently. Minister of Interior’s Order 4/2026 sets the method of calculation.
  • A zone figure is a zone-level estimate of what a plot allows. Confirm it for the specific plot with the planning authority or a qualified professional before relying on it.

What the four controls mean

Zone controls as the plans define them
ControlWhat it limitsWritten as
Building coefficient (συντελεστής δόμησης)The total covered floor area of all floors, relative to the plot’s net areaA ratio, such as 0.60:1
Coverage (ποσοστό κάλυψης)The share of the net plot area covered by buildings, seen from aboveA ratio, such as 0.35:1
Floors (αριθμός ορόφων)Floors counted on the vertical section where the building has the mostA whole number
Height (ύψος)From the mean level of the adjoining ground to the top of the roof slab, or to the eaves of a pitched roofMetres, such as 10.00

Net area is the plot area left after land is surrendered for roads, other access or public open space. The coefficient and coverage apply to the net area, which can be smaller than the registered area.

A coefficient of 0.60:1 is often quoted as 60%. The meaning is the same: counted floor area of up to 0.60 square metres for every square metre of net plot area.

Which plan sets the figures

Planning in Cyprus runs under the Town and Country Planning Law, Law 90/1972, which came into full application in 1990. The figures for a plot come from the development plan in force for its area:

  • Local Plans, for the main towns and some other areas, including Nicosia, Limassol, Larnaca and Paphos.
  • Area Schemes, for specific areas such as the centres of Nicosia and Limassol.
  • The Policy Statement for the Countryside, for areas with no Local Plan or Area Scheme in force. Its current text was notified in June 2024 and partly amended in December 2024.

Each plan has a zoning map that places every area in a zone, and a table that gives each zone its maximum coefficient, floors, height and coverage. Zone codes are not national. Local Plans use codes such as Κα (mainly residential), Εβ (commercial) and Γα (agricultural); Policy Statement sheets use others, such as Η (residential), Γ (countryside) and Ζ (protection). Read the figures from the table of the plan that applies, not from the code.

Plans change. In 2026 the Department of Town Planning and Housing began preparing new Local Plans for Nicosia, Limassol, Larnaca and Paphos, and it is revising the Policy Statement zones area by area. Use the version in force on the date that matters to you.

A worked example

The zoning sheet of the Tseri Local Plan 2024, notified in July 2024, sets these maximum figures for zone Κα8: a building coefficient of 0.60:1, 2 floors, a height of 10.00 m and coverage of 0.35:1.

Zone Κα8, Tseri Local Plan 2024, applied to a 600 m² net plot
ControlZone figureOn a 600 m² net plot
Building coefficient0.60:1Up to 360 m² of counted floor area
Coverage0.35:1Up to 210 m² of building footprint
Floors2At most 2 floors
Height10.00 mAt most 10.00 m

The controls work together. Two floors of 180 m² each would use the whole coefficient and stay within the 210 m² coverage. A single-storey house could not use it all, because its footprint is capped at 210 m².

The plan text adds conditions for some parts of zone Κα8, and the zoning sheet notes that the exact effect on a property is shown on the larger-scale cadastral plans.

These are zone-level figures. They show what the zone allows in principle, not what a specific plot can build. Confirm the figures for the plot before relying on them.

What can change the figure for a plot

The Minister of Interior’s Order 4/2026, published on 5 May 2026, sets one method for calculating the coefficient and coverage under Local Plans, Area Schemes and the Policy Statement, and replaced Order 4/2024. Within its limits it excludes spaces such as ancillary basement rooms and basement parking, covered parking on pilotis, some balconies and covered verandas, and roof-level lift and stair rooms.

Earlier documents set different limits for some of these exclusions, so check the Order in force on the date of the application.

  • Land surrendered for roads or public space reduces the net area. Where a published road plan affects a plot, the Policy Statement sets how the coefficient is then calculated.
  • Planning incentive schemes can allow extra floor area for qualifying developments, within the limits each scheme sets.
  • Under the Listed Buildings Law, Law 240(I)/2002, the Council of Ministers can set receiving areas where building coefficient transferred from listed buildings may be added.
  • Coastal and nature protection areas, including Natura 2000 sites, allow development only in limited cases.
  • The planning authority can adjust floors or height in the cases Order 4/2026 defines.

Where to confirm the figures

  1. Find the plan and zone. The Department of Town Planning and Housing publishes every Local Plan, Area Scheme and the Policy Statement, with zoning maps and notification dates.
  2. View the zone on a map. IPPODAMOS (ΙΠΠΟΔΑΜΟΣ), the department’s information system, has a public map for finding a parcel’s planning status. It warns that the zones and uses it shows may contain errors and should be checked against the published plans.
  3. Ask the planning authority. A Preliminary Query (EA8) under Article 25 of Law 90/1972 asks for the authority’s preliminary view in writing. The owner or a representative can submit it through IPPODAMOS with CY Login.
  4. Use a qualified professional. Most planning applications are submitted by a designer who is a member of ETEK with a valid licence to practise, such as an architect or civil engineer.

Under Article 25(8), the authority’s preliminary view is not a planning permit, but it binds the authority for one year unless it conflicts with the development plan that applies. A question about interpreting a development plan or the planned road network is answered within one month.

Since 1 July 2024, building permits have been issued by the new District Local Government Organisations instead of municipalities and district administrations, and the applications run through IPPODAMOS.

Map layers, including the planning zones Emvadon shows, can lag behind a newly published plan or revised zone sheet. The published plan and the planning authority’s answer are what count.

Sources

  1. Development plans: Local Plans, Area Schemes and the Policy StatementDepartment of Town Planning and Housing · Retrieved 4 November 2026
  2. Policy Statement for the Countryside, approved text 2024 (definitions in Appendix A)Department of Town Planning and Housing data as of 14 June 2024 · Retrieved 4 November 2026
  3. Order 4/2026: calculation of building coefficient, coverage, floors and heightDepartment of Town Planning and Housing data as of 5 May 2026 · Retrieved 4 November 2026
  4. Town and Country Planning Law, Law 90/1972 (consolidated text)CyLaw · Retrieved 4 November 2026
  5. Preparation of the Nicosia, Limassol, Larnaca and Paphos Local PlansDepartment of Town Planning and Housing data as of 23 July 2026 · Retrieved 4 November 2026
  6. Revision of the Policy Statement planning zonesDepartment of Town Planning and Housing · Retrieved 4 November 2026
  7. IPPODAMOS planning information systemMinistry of Interior · Retrieved 4 November 2026
  8. Planning licensing servicesDepartment of Town Planning and Housing (gov.cy) · Retrieved 4 November 2026
  9. Building permits: November 2025 (note on the 1 July 2024 transfer of competence)Statistical Service of Cyprus data as of 13 March 2026 · Retrieved 4 November 2026
  10. Planning incentives scheme for the recovery of business activityDepartment of Town Planning and Housing · Retrieved 4 November 2026
  11. Listed Buildings Law, Law 240(I)/2002 (consolidated text)CyLaw · Retrieved 4 November 2026
  • Review a parcel

    A parcel’s records, planning-zone context and open checks, with their sources.

  • Screen a development site

    A first-pass site screen with zone-level planning context, mapped constraints and explicit blockers.

  • Search planning records

    Planning and building permit records by parcel, authority, category and date. Precedent, not entitlement.

This guide is general information, not legal, valuation or planning advice. Confirm figures for a specific property with the competent authority or a qualified professional before you rely on them.